top of page

New and old sections :

With the rehabilitation, the height of the water level has been reduced

New and old top view

The construction of the intermediate floors and facilities is made in such a way that does not interfere the existing walls.

BACK TO INDEX

LIBRARY-POMPEU FABRA

 

 

PROJECT

 

 

© 2023 by Dawkins & Dodger Architecture. Proudly created with Wix.com

  • facebook
  • Twitter Round
  • googleplus
  • flickr
bottom of page